Concrete Calculator: Cubic Yards & Bags

Pick your shape — slab, footing, wall, round column or steps — enter the dimensions, and get the concrete you need in cubic yards, premix bags and estimated cost.

Quick answer

A 10 × 10 ft slab that is 4 inches thick needs 1.23 cubic yards of concrete, or about 56 bags of 80-lb mix (one cubic yard is about 45 bags). Formula: length × width × thickness (inches ÷ 12) ÷ 27 = cubic yards. Add 5–10% extra for waste.

Your numbers

ft
ft
in
Patio or walkway: 4 in. Driveway or garage floor: 5–6 in.
ft
in
in
ft
ft
in
in
ft
ft
in
in
ft
in
in
in
ft
in
in
in
in
ft
%
$
Optional — for the cost estimate.

Result

How to calculate how much concrete you need

Concrete is sold by volume — cubic yards from a ready-mix truck, or bags of dry premix measured by their yield in cubic feet. Every calculation follows the same three steps: find the volume of the shape in cubic feet, add a waste allowance, then convert to yards or bags.

cubic yards = cubic feet ÷ 27
80-lb bags = cubic feet ÷ 0.60  |  60-lb bags = ÷ 0.45  |  40-lb bags = ÷ 0.30

Formulas for each shape

ShapeVolume (cubic feet)
Slab, patio, driveway, walkwaylength (ft) × width (ft) × thickness (in ÷ 12)
Footing or trenchlength (ft) × width (in ÷ 12) × depth (in ÷ 12)
Walllength (ft) × height (ft) × thickness (in ÷ 12)
Round column, pier, post holeπ × (diameter in ÷ 24)² × height (ft) × quantity
Solid stepswidth (ft) × riser (ft) × tread (ft) × n(n+1) ÷ 2
Circular slabπ × (diameter ÷ 2)² × thickness (in ÷ 12)
Hollow tube or ringπ × (outer radius² − inner radius²) × length
Curb and gutter(curb depth × curb height + gutter width × flag thickness) ÷ 144 × length

For an L-shaped or irregular pour, split it into rectangles, calculate each, and add them. For several different shapes — say a patio plus a footing — run the calculator once per shape and add the yardage.

Worked example: a garage apron

You want a 12 × 20 ft apron, 5 inches thick. Volume = 12 × 20 × 5 ÷ 12 = 100 cubic feet = 100 ÷ 27 = 3.70 cubic yards. With 10% waste you need 4.07 cubic yards; most suppliers round up to the next quarter or half yard, so ask for about 4¼. At $165 per yard that's roughly $670 delivered, whereas 183 bags of 80-lb mix would be impractical — a good illustration of why trucks win above one yard.

How far does a cubic yard of concrete go?

Thickness1 cubic yard covers
3 in108 sq ft
4 in81 sq ft
5 in65 sq ft
6 in54 sq ft
8 in41 sq ft
10 in32 sq ft

Concrete slab size chart (cubic yards)

Quick reference for common slab sizes, before waste. Add 5–10% for a real order. The last column shows how many 80-lb bags a 4-inch slab needs.

Slab size4 in thick5 in thick6 in thick80-lb bags (4 in)
8 × 8 ft (64 sq ft)0.790.991.1936
10 × 10 ft (100 sq ft)1.231.541.8556
10 × 12 ft (120 sq ft)1.481.852.2267
12 × 12 ft (144 sq ft)1.782.222.6780
12 × 16 ft (192 sq ft)2.372.963.56107
12 × 20 ft (240 sq ft)2.963.704.44134
16 × 16 ft (256 sq ft)3.163.954.74143
20 × 20 ft (400 sq ft)4.946.177.41223
24 × 24 ft (576 sq ft)7.118.8910.67320
24 × 30 ft (720 sq ft)8.8911.1113.33400

Bags or ready-mix: which is cheaper?

A cubic yard is 27 cubic feet, so it takes 45 bags of 80-lb mix (60 bags of 60-lb, or 90 bags of 40-lb) to make one yard. Bags cost more per yard than a truck, but they need no minimum order and no pump or chute. As a rule:

Slab thickness and strength

UseTypical thicknessTypical strength
Walkways, patios, shed floors4 in3,000 psi
Driveways, garage floors5–6 in3,500–4,000 psi
Heavy-duty pads and slabs with vehicles over 10,000 lb6–8 in or engineered4,000+ psi

In freeze–thaw climates ask your supplier for air-entrained concrete. Slabs are normally poured over 4 inches of compacted gravel (use the gravel calculator for the base) with wire mesh or rebar for crack control.

How much extra should you order?

Ten percent is a safe default. Subgrades are never perfectly level, forms bulge slightly, and some concrete stays in the truck or wheelbarrow. Running short in the middle of a pour creates a cold joint, which is far more expensive to fix than a few extra bags are to buy. Use 5% for a precisely dug, small footing and up to 15% for uneven ground.

Preparing for a ready-mix pour

Common mistakes to avoid

Frequently asked questions

How many bags of concrete are in a cubic yard?

A cubic yard is 27 cubic feet. That is about 45 bags of 80-lb mix (27 ÷ 0.60), 60 bags of 60-lb mix, or 90 bags of 40-lb mix.

How many bags of concrete do I need for a 10×10 slab?

A 10 × 10 ft slab at 4 inches thick is 33.3 cubic feet, or 1.23 cubic yards. With 10% waste you need about 62 bags of 80-lb mix — at that size a ready-mix truck is usually the better choice.

How much does a cubic yard of concrete weigh?

Standard concrete weighs roughly 4,000–4,050 pounds (about 2 tons) per cubic yard, depending on aggregate and moisture.

How much does a yard of concrete cost?

Ready-mix typically costs about $130–$200 per cubic yard delivered in most US markets, plus short-load, fuel or pump fees. Bagged concrete costs around $5–$8 per 80-lb bag.

How do I calculate concrete for a footing?

Multiply the footing length (ft) by its width (in ÷ 12) and depth (in ÷ 12) to get cubic feet. Choose "Footing or trench" above and the calculator does the conversion.

How thick should a concrete slab be?

Four inches for patios, walkways and sheds; five to six inches for driveways and garage floors; thicker or engineered for heavy loads.

How much extra concrete should I order?

Order 5–10% more than the calculated volume. Use the higher end for uneven ground, small forms or hand-mixed batches.

Should I use bags or ready-mix?

Bags make sense for jobs under about one cubic yard. Above that, mixing dozens of bags by hand is slow and the finish is less consistent, so ready-mix is usually the better value.

Sources and further reading

These references support the general guidance on this page. The calculator applies the standard formulas shown above to the numbers you enter.

Related calculators

. Estimates only. Always confirm quantities with your supplier or a qualified contractor before ordering, and add extra for waste and site conditions.